Hythe, Kent

ONE62

We worked closely on theis project with Guy Holloway, a leading UK architectural firm whose main office is located locally in Hythe, to create a contemporary design which includes six spacious apartments with balconies and/or outside space.

We started work on this development in January 2018 and expect to have it completed by November 2018. The apartments are very centrally located in Hythe and will be completed in a modern style to a high level of specification. The central location of the development, across the street from Waitrose on one side of the building and with direct level access to the High St on the other, means all of the amenities of Hythe town centre are within easy walking distance.

Excellent restaurants such as top modern british restaurant Hythe Brasserie, Indian fusion restaurant Copper and Spices and Thai restaurant Thailand Tom are all within easy walking distance, as are the boutique shops and gastropubs located in the High St. The Royal Military Canal is located on the other side of Prospect Road and the beachfront is a short walk away.

In keeping with the high quality external finishes and appearance of the building, the internal specifications of the apartments will be high. They will feature underfloor heating, contemporary style kitchens with granite worksurfaces and bathrooms by Villeroy and Boch. The top floor penthouse on the top floor will have sweeping views over Hythe Town to the front and rear.

We expect to pre-sell this scheme prior to completion, so if you are interested in purchasing, we recommend registering your interest at an early stage at Sales@MeltHomes.co.uk or calling our office on 01233 809 002.

Please see the pictures and updates showing the progress of works on site below. We'll be updating these regularly as the project progresses.

Update 10th February 2018

We have now completed reduced level dig, site clearance and piling. All 45 piles went in last week and the work was completed ahead of schedule. Work on the foundation will commence this coming week.

Update March 2018

The final stage of groundworks including installation of the drainage and development of the foundation have taken place. Steel raft structure started.

Update April 2018

Concrete has been poured to complete the ground floor slab. We begin to start building vertically as the building starts taken shape. 